Legacy Connector

The long-awaited Legacy Connector is open!  Now, a visit to and from Legacy Park and the Green Line of the Prisma Health Swamp Rabbit Trail can be enjoyed by all.

Tell us what you think!  Email us at AskVerdae@Verdae.com

Verdae Development has constructed a trail connection from Legacy Park to the SRT.  The new trail provides a beautiful walk within a natural setting.  The path has been carefully aligned, with utmost attention to tree preservation and environmental sensitivity.  The Legacy Connector is a slow zone with a maximum speed of 10mph for non-motorized use.

We applaud all the planning team partners for their excellent work!

• Verdae Development – Project Developer

• Kimley-Horn Engineering Planning and Design Engineer

Beau Welling DesignLandscape Architect

Harper General ContractorConstruction Contractor

S&MEEnvironmental Engineer

Arbor SourceCertified ISE Arborist Inspector

City of GreenvilleFuture Owner of the Public Asset

Greenville County Parks, Recreation and TourismSRT Authority

Upstate Forever, Friends of the Reedy River and TreesUpstate have provided environmental support recommendations and project endorsement for the Legacy Connector redesign.


 

Download the final Legacy Square Project Update

1/23/2024 Update PDF

Download the December 2023 Legacy Connector Project Update

12/21 Update PDF

Download the November 2023 Legacy Connector Project Update

11/30 Update PDF

Download the October 2023 Legacy Connector Project Update

10/31 Update PDF

Download the September 2023 Legacy Connector Project Update

9/25 Update PDF

Download the August 2023 Legacy Connector Project Update

8/28 Update PDF

Download the July 2023 Legacy Connector Project Update

7/27 Update PDF

Download the June 2023 Legacy Connector Project Update

6/28 Update PDF

Download the Pre-Construction Walk Event Recap

5/31 Event PDF

Download the May 2023 Legacy Connector Project Update

5/24 Update PDF

Download the April 2023 Legacy Connector Project Update

4/25 Update PDF

Download the March 2023 Legacy Connector Project Update

3/27 Update PDF

Download the February 2023 Legacy Connector Project Update

2/27 Update PDF

Download the January 2023 Legacy Connector Project Update

1/30 Update PDF

Download the December 15, 2022 SRT-LS Connector Working Group Meeting Recap

12/15 Recap PDF

Download the July 21, 2022 SRT-LS Connector Working Group Meeting Recap

7/21 Recap PDF

Download the April 8, 2022 SRT-LS Connector Working Group Meeting Recap

4/8 Recap PDF

Download the March 8th, 2022 SRT-LS Connector Working Group Meeting Recap

3/8 Recap PDF
 